Standing-seam metal roof
Cedar HollowWhat we found and what we changed
- What we found
- Water stains in the den where a low-pitch addition met the main roof, and shingles that were never rated for a slope that shallow.
- What we changed
- Replaced the whole roof with standing-seam steel, re-flashed the joint with the addition and ran ice and water shield along the valley.
- Material
- 24-gauge steel, charcoal
- On site
- 3 days
- Result
- No leaks through two winters